In the morning of 26 June 2006, Tianjin Binhai
New Area saw the opening of a ceremony in celebration of the launch of the one
million tpa ethylene and associated facilities project, which marked that this
world-class integrated project of ethylene refining and petrochemical production
has been jumpstarted.
This Tianjin-based one million tpa ethylene
and associated facilities project comprises three parts, which are respectively
ethylene project, revamping of refinery and thermal power generation facilities.
Once this project is completed in 2009, Sinopec Tianjin Company will then see
its aggregate ethylene production capacity reach 1.2 million tpa, and its oil
refining and comprehensive processing capacity account for 12.5 million tpa,
thus becoming one of the country?s 10-million-tonnage oil refining bases and
also one of China?s 1-million-tonnage integrated ethylene production bases. By
then, the company will be able to produce 12 million tpa of petroleum,
petrochemical and chemical fiber products of superior quality and higher grades,
which are available in a wide variety.
This project will be constructed in adherence
to its guiding principles of ?regionalization, world scale, integration,
specialization?, while featuring such advantages as uniformly designed &
deployed supporting facilities, compact and rational layout, streamlined
technological flow, mutual supply of materials intramurally, occupancy of
limited land resources, a controlled sum of investments and reduced costs, etc.
Besides, this project meets the requirements under a scientific development
principle and conforms to the creed of sustainable growth of economy; in
practices, all those land sections acquired newly for this project have been
alkaline wastelands; and most of the water additionally required by this project
has been desalted seawater and recycled intermediate water. In addition, this
project has selected advanced pollution-free production techniques and highly
efficient equipment items from both home and abroad, and taken stronger measures
in sorting out and disposing of its generated pollutants as well as making
integrative use of such pollutants, in an aim to become an exemplary project
which is energy saving, eco-conscious and environment friendly, too. On top of
that, as a pilot player in producing ethylene based on domestic production
techniques, this project will also exert a positive influence for the sakes of
disseminating more giant-sized, domestically manufactured ethylene facilities,
helping ethylene facilities manufacturers upgrade their technologies, as well as
giving a boost to the development of those downstream sectors of the
petrochemical industry.
The petrochemical
industry, which is characterized by the ethylene sector, is a significant pillar
of national economy. As ethylene is a knockout product and fundamental raw
material in the petrochemical industry, its production output has now become an
indicator standing for the degree of development of a country?s petrochemical
industry. The launch of Tianjin one million tpa ethylene and associated
facilities project is of great significance for adjusting the structure of
China?s petro-chemical industry, reinforcing the international competitiveness
of China?s petrochemical industry, and promoting the economic growth in the
Pan-Bohai Sea area. As competent authorities in Tianjin Municipality and Sinopec
Corp. have both remarked, hard efforts shall be made to enable this project to
become the most competitive petrochemical player, and contribute heavily into
the growth of national economy, by means of following out the creed of
scientific development and bring into full play the advantages of all
parties.